Sanitation opening Ø 50 mm (both locations are suitable)
Hot water (¾" stopcock max. 16 cm high from the floor)
Cold water (¾" stopcock max. 16 cm high from the floor)
Supply wire cable (2 m long)
Additional earthing wire cable (2 m long)
Mineral water (¾" stopcock max. 16 cm high from the floor)
TECHNICAL DATA
1. WATER PRESSURE IN THE SYSTEM OF UNDERWATER SHOWER MASSAGE DEVICE
Nozzle 7 mm ................................ 0–0,36 MPa
Nozzle 9 mm ................................ 0–0,33 MPa
Nozzle 11 mm .................................. 0–0,3 MPa
2. TIME FOR FILLING THE BATH
In the case of water pressure in the supplying system about 0,35 MPa and hot and cold water connections ¾" – approximately 4 minutes.
3. TIME FOR DRAINING THE BATH
In the case of sanitation opening in the floor with Ø 50 mm and sanitation
magistral pipe under the floor with Ø 100 mm – approximately 6 minutes.
4. MEASURES FOR CONNECTIONS OF HOT AND COLD WATER – ¾".
5. MEASURES FOR CONNECTIONS OF MINERAL-, SEA- AND
IODINE-BROMINE WATER – ¾".
6. MEASURE FOR WATER DRAIN CONNECTION – Ø 50 mm