Integration of technical units is the answer to the finish of the wall in respect to hygiene. Easy access to electrical equipment and medical gases
This wall integration solution is totally adapted for better asepsis and will contribute to the prevention of infections. Horizontal or vertical possible installation.
Special frame for special finish on demand.
The system is adapted to be integrated into the wall plaster panels between 13 and 26 mm. Easy rear clipping fixation bracket by front screwing.