The project definition always starts from on-site supervision to check installation area and discuss with end user about specific needs. In function of possible physical constraint first evaluation is about the possibility to use gravity discharge or to evaluate alternative system like Vacuum Transport System (VTS).
First of all, a preliminary design is realized and once the real project starts an ergonomic study on a 1:1 scale mock-up is performed to check real activities to be performed.
Once this critical step is completed the final manufacturing of the system is started.
FPS propose different configurations:
Single chamber mobile reactor loading system for small quantity of product handling
up to OEB4 category (CPT down to 1000 nanograms/m3). The system was designed to be movable, flexible and interchangeable on different reactors thanks to adjustable height and trans pallet connection system. Product coming in bags (max 8-10 kg each) was safely loaded by FPS bag-in system into main chamber. From main chamber was discharged by gravity or by VTS (Vacuum Transport System) directly into reactor and waste bags removed from back installed FPS Continuous liner system. System rated for ATEX installation area, with full cleaning in place system by integrated spray balls and washing gun. System can be manufactured in AISI316L SS, HC22 or with different surface treatment/coating to meet strict working condition in chemically aggressive atmosphere.
Single chamber reactor charging system for larger quantity of product handling
up to OEB4 category (CPT down to 1000 nanograms/m3).