The FRI range allows daily working time up to 24 hours. FRI equipment is made in two steps, including a primary combustion chamber, with a hot-hearth construction, which ensures the total destruction of the waste. An integrated post-combustion system completes the process, to guarantee maximum gas turbulence, and ignite the gases which remained unburnt during the first combustion.
SOLID WASTE LOADING
The FRI series incinerators are designed for automatic loading with hydraulic assistance. Loads of all types of waste are done through a front access, which reduces heat loss during loading.
The FRI range allows daily working time up to 24 hours. FRI equipment is made in two steps, including a primary combustion chamber, with a hot-hearth construction, which ensures the total destruction of the waste. An integrated post-combustion system completes the process, to guarantee maximum gas turbulence, and ignite the gases which remained unburnt during the first combustion. These gases are maintained for a minimum of 2 seconds at temperatures from 900°C to 1200°C, thus ensuring complete incineration of its components (oxidation).
SOLID WASTE LOADING
The FRI series incinerators are designed for automatic loading with hydraulic assistance. Loads of all types of waste are done through a front access, which reduces heat loss during loading.
AUTOMATIC DE-ASHING
The discharge located under the incinerator is separated from the combustion chamber by means of a hydraulically controlled ashes removal hatch.