1st step:
Prepare the implantation site.
Select the staple size that matches the patient and the implant site.
2nd step :
Using an impactor, push the staple into the bone until the underside of the bridge is flush with the bone surface.
Then push on each corner of the staple bridge to finish the impaction.
3rd step :
Check that the staple placement is correct. If additional compression or stabilization is required, multiple staples can be used.
Ablation Technique :
To remove the staple, the puller is used to lift the staple bridge and remove the staple.